Badminton Court

Compound silicon PU badminton courts, is the reference compound plastic runway, with glue and black particles according to certain proportion and stir well laid into the stadium as the elastic layer, thereby increasing the thickness of the pitch, conventional silicon PU stadium under standard thickness of 3-5 mm, thickness of plastic runway and compound silicon PU stadium of international standard 13.0 mm thick, In the performance of the court is also better than the original many. 

keyword;

Badminton Court

Description

Compound silicon PU badminton courts, is the reference compound plastic runway, with glue and black particles according to certain proportion and stir well laid into the stadium as the elastic layer, thereby increasing the thickness of the pitch, conventional silicon PU stadium under standard thickness of 3-5 mm, thickness of plastic runway and compound silicon PU stadium of international standard 13.0 mm thick, In the performance of the court is also better than the original many.

Features

Features of Badminton Court 
Easy maintenace Environment friendly,long lasting
Rigid construction Flexible.cushion.shock absorb
Perfect fitting Anti-slip
Highly adhesive Comfort
Easy to apply Highly wear resistance

 

Construction Steps

gss

1.Line

2.Topcoat

3.PU primer

4.1-3 EPDM

5.Cement/asphalt

 

Honors

gssGSSGSSGSS

 

Application field

gss

Package and Shippment

GSS

FAQ

Q1:Are you a factory or a trade company?
A1:We are an industry and trade company.Welcome to China factory inspection.

Q2:What is thickness for the IAAF Running Track?
A2:The International Standard thickness is 13mm.Other sizes are available as your request.

Q3:Can we get installation support if we have no own constructors?
A3:We can send salesmen and technical support to your country to assist the installation.

Q4:Are your running track materials safety?
A4:Yes,our materials are safe.Environmentally friendly and recyclable.

Q5:How do you make our business long-term and good relationship?
A:1.We keep good quality and competitive price to ensure our customers benefit;
2.We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.

Q6:What is your terms of payment?
A:T/T 30%as deposit,and 70%before delivery.We'll show you the photos of the products and packages
before you pay the balance.

Q7:What is the Production time?
A:It is about 10-15days.

Q8:What are the options for the base construction of a running track.?
A:The ground is based on asphalt or concrete.

Q9:What is the life Span for Running track?
A:The life span is about 10-15years.

Q10:I am Interested in Synthetic track surface,what is the best choice?
A:We have 4 system:Spray coat,Sandwich,Full pour and Prefabricate system.

Message

We will contact you as soon as we receive the information