Elastic epoxy grinding stone

The environmental friend polyurethane elastic series material with high strength, high elongation and not easy to crack is used as the foundation of terrazzo ground to replace the rigid cement material which is easy to crack, so as to ensure that the ground of the grinding stone does not crack.

keyword;

Elastic epoxy grinding stone

Description

The environmental friend polyurethane elastic series material with high strength, high elongation and not easy to crack is used as the foundation of terrazzo ground to replace the rigid cement material which is easy to crack, so as to ensure that the ground of the grinding stone does not crack.

Features

Features of Elastic epoxy grinding stone
Wear-resisting compressive Permeability anticorrosive
Bright and anti-aging Short construction period
Overall seamless personalized customization Environmental and non-poisonous

Construction Steps

Structural diagram of elastic epoxy grinding stone

1 Elastic epoxy grinding stone surface 

2 Polyurethane reinforced layer 

3 Polyurethane cracking and dampling buffer layer

4 Solvent-free polyurethane base coating 

5 Concrete foundation

 

Honors

gssGSSGSSGSS

 

Application field

gss

Package and Shippment

GSS

FAQ

Q1:Are you a factory or a trade company?
A1:We are an industry and trade company.Welcome to China factory inspection.

Q2:What is thickness for the IAAF Running Track?
A2:The International Standard thickness is 13mm.Other sizes are available as your request.

Q3:Can we get installation support if we have no own constructors?
A3:We can send salesmen and technical support to your country to assist the installation.

Q4:Are your running track materials safety?
A4:Yes,our materials are safe.Environmentall friend and recyclable.

Q5:How do you make our business long-term and good relationship?
A:1.We keep good quality and competitive price to ensure our customers benefit;
2.We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.

Q6:What is your terms of payment?
A:T/T 30%as deposit,and 70%before delivery.We'll show you the photos of the products and packages
before you pay the balance.

Q7:What is the Production time?
A:It is about 10-15days.

Q8:What are the options for the base construction of a running track.?
A:The ground is based on asphalt or concrete.

Q9:What is the life Span for Running track?
A:The life span is about 10-15years.

Q10:I am Interested in Synthetic track surface,what is the best choice?
A:We have 4 system:Spray coat,Sandwich,Full pour and Prefabricate system.

Message

We will contact you as soon as we receive the information